Merrick and Company

FY05 Predator Maintenance Complex

Project Description

RETURN TO MERRICK

Mr. Lagomarsino was the Lead Designer and Project Architect for the Predator Maintenance Complex. Responsibilities include Project Architect, Lead design, and Production supervisor for the three facilities.

The entire Predator Maintenance complex has received 4 national design citation awards.

This animation above should start playing right away.

This was a preview animation done gratis for the client. It is not a final render.

FY04
Squadron Operations AMU Hangar
2006 USAF Level, Best Built Design Citation
FY04
Squadron Operations AMU Hangar

2006 USAF, Air Combat Command Level, Best Built Design Citation.

FY04
Squadron Operations AMU Hangar
2005 National Council of Structural Engineers Structural Design Excellence Citation
FY05/06
Predator Maintenance Complex
2005 USAF, Air Combat Command Level, Best Facility Design Citation.

The continuation of the master planning of Indian Springs Auxiliary Air Field included the FY05 facilites for Predator Maintenance. These facilities include a General Purpose Maintenance facility (GPMX in two phases for FY05 and FY06), an Aerospace Ground Equipment, (AGE), and the first of its kind Ground Control Station, (GCS), also in two phases for FY05 and FY06. Each facility was designed to support the expanding needs of the Predator reconnaissance mission in fast track mode. The FY06 constructtion documents were desgined simultaneously with the FY05 to allow for immediate startup for the FY06 construction once the funds were released.

 

GPMX

 

GCS AGE

 

Other Projects for this firm

     

GCS Ground Control Station

 
 

Resume Home